Percolator Electric
This regulation establishes the minimum conditions to be complied with electrical installations to ensure the safety of persons and property and ensure reliability of operation. Applies to installations in buildings for housing, shops, offices and facilities in places where similar functions are met, including temporary or temporary, with alternating voltage of 1,000 V (rms) between phases and nominal frequency of 50 Hz (see IRAM 2001). e) The specific facilities that have a use related to critical care or services that require additional conditions of security and continuity of special services. For these installations may establish special requirements, however in the absence and they must at least satisfy the specifications of this regulation as applicable to them. In installations with a rated voltage of 110/230 volts, the insulation measurement must do it with a DC voltage of 330 volts. The resistance between the points must be greater than 0.3 MW. Damage from surges in electrical installations is becoming more frequent. Especially in the computer systems that can break if not well protected against them. It is therefore advisable to perform periodic measurement of the installation of insulation you have in your home. The causes of the surge can be many, including the impact of lightning on the house. This installation may be subjected to very high potential in a short period of time, immediately destroy connected equipment. The beam impact may be direct, as above, or far. This second occurs when the building is not directly hit by lightning, but the blast wave is transmitted through the grid lines. Other processes can affect the electrical grid. They can also damage the equipment you're using operations such as switching on and off or switching of inductive or capacitive loads that produce surges. To avoid irreparable damage, you should verify that the installation meets the requirements regarding protection of humans, animals and electronic equipment. Measurement of insulation you have to do it by putting the service of electrical installation work and repeat after modification or repair it. If the resistance was very low, the cables may become the focus of a fire. In installations with a rated voltage of 110/230 volts, the insulation measurement must do it with a DC voltage of 330 volts. The resistance between the points must be greater than 0.3 MW. These points are among the active phases and the protective conductor between the neutral and protective conductor and between the active phases. Finally, if you do the strength test, you must do it without network connection. For your own safety and the equipment you have at home, checks the test circuit is connected appliances that may be affected by stress testing. To provide electric power a lamp hanging from the ceiling is necessary to get her drivers. If they remain in sight, deform the whole, therefore, we can embed them as explained below. 1. First of all, we will draw the way forward for the installation (which should be as short as possible to avoid useless work) we will do with a pencil or a piece of string to draw. Also mark the location of the switch and the light point. With a chisel, a sort of large nail-broadleaf and a pot, make a slash that follows the path. 2. We introduce the wires in the tube flush. It will fit in and keep slashing at the site, holding it with a few nails stuck slightly on the bias, we will assist the tube does not fall. 3. Also will post boxes recessed switch and lamp. The percolator electric latter consistent with plaster look it does not break. The installation usually takes three wires, each color to make the connections without mistakes. 5. With a spatula-type pelta Berthelet, we smooth the plaster avoiding heavy sanding operation. If you lack it, alisaremos first, let dry and then lijaremos until the surface is completely smooth. Let it dry completely set and paint the ceiling and walls. 6. Finally, install the mechanisms and the suspension point of the lamp. We use one in the plate to close the recess box, securing it with screws. Instead we can use plastic anchors and overturning if we work on a ceiling.